duncanreleford
duncanreleford duncanreleford
  • 12-03-2018
  • Physics
contestada

determine the quantity of work done when a crane lifts a 100-n and block from 2 m above the ground to a 6 m above the ground

determine the quantity of work done when a crane lifts a 100n and block from 2 m above the ground to a 6 m above the ground class=

Respuesta :

lidaralbany lidaralbany
  • 07-02-2019

Answer: 400 J

Explanation :

Given that,

Force = 100 N

Distance  = 6 m - 2 m = 4 m

Now , the work done is equal to the multiplication of the force and distance.

W = F * d

[tex]W = 100\ N\times 4\ m[/tex]

[tex]W = 400 J[/tex]

Hence, the quantity of work done is 400 J

Answer Link

Otras preguntas

An instrument called a ________ is used to measure the volume of air that moves into and out of the lungs. a. Hydrometer b. Barometer c. Spirometer d. None
The opportunity cost of capital refers to the - Options net present value of the investment. Return that is foregone by investing in a project. Required inv
round 5.36201 to one decimal place
why does water form large round drops as it falls from a faucet with a slow leak
write the number 34 and the number 43 an tens plus ones. Describe how they are different.
expanded form for 24.76
Define percent .write 25/100 as a percent then write 25/100 as a decimal.
Seaweed and kelp are _____ algae.A.brown b. red c. fire d. golden-brown
Do Athens or Spartans have more geographic area on the map?
_______ are atoms that carry an electric charge. A. Nonelectrolytes B. Ions C. Colloids D. Electrolytes