camryn903 camryn903
  • 13-10-2017
  • Computers and Technology
contestada

"​the three legs of a project triangle are _____, scope, and time."

Respuesta :

Kalahira
Kalahira Kalahira
  • 23-10-2017
The project cost is the third leg of the triangle. This is one of the most important parts, simply because this can determine what parts of the project can or cannot be undertaken. Without the proper funding for the project, little can likely be done.
Answer Link

Otras preguntas

Read the sentence. When black and white are mixed together to add to a color, it is called _[blank]_. Which option correctly completes the sentence? a tint a
Does anyone know the answer
How does President Lincoln's Gettysburg Address differ from his second inaugural address? A. In the Gettysburg Address, saving the Union is the focus.
Which nation did the soviet union invaded in the late 1970s apex?
Identify one consequences brought about by the steamboat (A) sailboats went out of style (B) people got to gamble on the rivers(C) people liked them because
If the equation of a function is a rational expression, the function is rational true or false
Which of the following best states the difference between a theme and a topic? (5 points) A topic develops a message about life while theme is the main subje
Which part of the health triangle deals with managing stress? A. Mental and emotional B. Physical C. Public and personal D. Social
Explain why people are hesitant to drill for oil in the Arctic National Wildlife Refuge.
d(1)=3 d(n) = d(n-1) - 14 what is the third term in the sequence