  • Mathematics
contestada

Labor rate = $7.50 per hour Labor time = 6.5 hours Retail price of parts = $0 Total job cost = $82.00 Overhead rate?

Respuesta :

Aliwohaish12
Aliwohaish12 Aliwohaish12
  • 13-07-2017
Total cost job=
Retail price of parts+labor cost+manufacturing overhead

Total cost job 82

Retail price of parts 0

Labor cost=7.5×6.5=48.75

Manufacturing overhead ?

82=0+48.75+?

?=82−48.75

?=33.25

Manufacturing overhead is 33.25

Now find manufacturing overhead rate from the cost of labor
33.25÷48.75=0.682×100=68.2%

The answer 68.2%




Answer Link

Otras preguntas

Why did the united states and the soviet union become political rivials after world war 2?
1. An outline is *4 points a) a dictionary entry b) an organized or systematized arrangement of important elements of a topic c) a place to locate information d
If mitotic cell division is the only way a particular species of single-celled organism can reproduce, it is most likely that
38/24 equal to a mixed number
(60 Points)Question 1 Use the net to determine the total surface area. (Picture 1) A. 72 in2 B. 192 in2 C. 232 in2 D. 200 in2 Question 2 Use the net to determ
The best way to avoid out of time at college fairs is to
The respiratory membrane is a combination of ________. a. atria and alveolar sacs b. respiratory bronchioles and alveolar sacs c. alveolar and capillary walls a
A vegetable store sold 3 tons of vegetables less on the first day than on the second, and on the third day it sold 5/9 of the amount sold in the first two days.
what is the volume of this cube
HELP ME WITH MATH PLEASE!!! thank you