All the members of a construction crew work at the same pace. Six of them working together are able to pour foundation in 22 hours. How many hours would this job take if the number of workers: increased 4 times

Respuesta :

coreyg802 coreyg802
  • 16-05-2017
it would be 12 hours. 

Answer Link
PLSsHELPMEH PLSsHELPMEH
  • 10-11-2018

It is 5/66 of an hour

Answer Link

Otras preguntas

how does water get to the laves in the top of the tallest trees against the force of gravity
what 3 digits are in the units period 4,083,817
The Russian Empire was multi-ethnic with populations of which of the following? Slavic peoples Muslim Serbs Turkic Muslims Non-Slavic Europeans German migrants
What problems do people who live in the desert encounter?
What were some key benefits for Europeans during the Age of Exploration? Check all that apply. A) There was an increase in mercantilism. B) Kings, merchants
sentence for compressions
which letter correctly describes the location of the alps
0.7 repeating decimals as a fraction
point slope form equation of line theough each pair of points (1,9) (6,2)
how tolerant were the puritans of those who differed from the norms