Shane industries prepared a fixed budget of 60,000 direct labor hours, with estimated overhead costs of $300,000 for variable overhead and $90,000 for fixed overhead. shane then prepared a flexible budget at 57,000 labor hours. how much is total overhead costs at this level of activity?