alyssawilmoth1
alyssawilmoth1 alyssawilmoth1
  • 15-09-2022
  • Mathematics
contestada

A construction crew has just built a new road. It took them 8 weeks to build 10.24 kilometers of road. At what rate did they build the road?

Respuesta :

Aswanglol6
Aswanglol6 Aswanglol6
  • 15-09-2022

Answer:

Are you trying to figure out how long the road is?

10.24 km per week, times 4 weeks.

10.24 x 4 = 40.96

Step-by-step explanation:

Answer Link

Otras preguntas

Jack and his friends are collecting cans for the food bank. Thus far, they have collected 1500 cans. Jack has collected 60 percent of the cans. Marcia has colle
What times what equals 51
Which sentence uses a verb that agrees with its subject? A. Three slices of apple pie is in the refrigerator. B. The crackers in that bag is not fresh anymore.
Solve this problem that has a class divided. 0+50x1-60-60x0+10=?
Which U.S. senator used Americans' fear of communism to promote his career by making baseless accusations of communist activities in the United States? (Points
Since it was raining so hard, I decided not to go to the golf course. Identify the preposition in the sentence above.
is 36 yards 2 feet greater than less then or equal to 114 feet 2 inches
How do spermatogenesis and oogenesis differ in terms of the number of gametes they produce? Spermatogenesis produces four functioning gametes, and oogenesis pro
When a family with 2 adults and 3 children bought tickets for an amusement park, they paid a total of $56.50. The next family, with 4 children and one adult, pa
Brad sold 5 times as many raffle tickets as Doug. They sold 120 raffle tickets in all. Write an equation to answer this question.