mavhabazakhosa
mavhabazakhosa mavhabazakhosa
  • 15-05-2022
  • Mathematics
contestada

contsruction workers resurface parts of the N1 highway . they completed 2km per day how many kilometers are completed in total after the first three years​

Respuesta :

zazudesai1999
zazudesai1999 zazudesai1999
  • 15-05-2022

Answer:

2 190km

Step-by-step explanation:

365×3= 1 095

1 095×2km= 2 190km

Answer Link

Otras preguntas

What is the mass of a white dwarf star compare to the sun?
Is it true that the american troops under william henry harrison captured canada for the united states
What are diffusion mean?
A list of providers that except share of cost medicaid in florida?
A small town surveys 250 adults, 180 of which are parents, about whether or not a park should be expanded. The results showed that 150 of the adults with childr
The lengths of the sides of a triangle are in the extended ratio 4 ​: 9 ​: 10. the perimeter of the triangle is 115 cm. what are the lengths of the​ sides?
what does final position mean
WORTH 24 POINTS PLZ HELP DUE TODAY!!!!!!!!!!I need 3 direct objects found1 Indirect object2 Predicate Nominative1 Predicate AdjectPlz help it is due today
Which value of x from the set {4, 5, 6, 7}, makes this equation true? 4(8 − x) = 8
How can i use decimal models to add decimals?