preeshapatel09 preeshapatel09
  • 15-05-2022
  • Mathematics
contestada

Roadstone Limited can resurface 7/8km of a road in a day. How many days will it take
to resurface a road of length 14 km?

Respuesta :

profarouk profarouk
  • 15-05-2022

Answer:

16 days

Step-by-step explanation:

Let x be the number of days that it will take.

7/8 km per 1 day

14 km    per x day

We have to solve the equation:

[tex]\frac{x}{1} =\frac{14}{\left( \frac{7}{8} \right) }[/tex]

[tex]\Longrightarrow x=14\times \frac{8}{7} =2\times 8=16[/tex]

Answer Link

Otras preguntas

Pls help what’s the perimeter and area
Use the gcf and the Distributive property to express the sum as a product 21+28
I’m lost please help
3. In the reaction of hydrogen with iodine_ A. iodine is oxidized B. hydrogen is oxidized C. hydrogen is reduced
19 Phil invests £800 for 3 years in a bank account. The account pays simple interest at a rate of 2% per year. Work out the total amount of interest Phil has go
0.9y-0.7=4.2 Need help
Amanda teaches all of the bass and viola students. All of her classes have the same number of students. Each class has the greatest possible number of students.
Relations and functions. wanted to know if i did this right so an explanation would be nice, thank you.​
2. This story is mainly told by a third-person narrator. The narrator is recording the actions of the story, but occasionally the narrator or author breaks away
Find the distance between the points (7, -2) and (2, -10).