Which of the following is NOT a method of scheduling?

Respuesta :

Аноним Аноним
  • 11-03-2022

Answer:

Social meadia

critical path method

Explanation:

mark as brainlist please

Answer Link

Otras preguntas

When looking at a graduated cylinder, what is the meniscus and why is it important?
What does deregulation mean? List an example please.
What does it mean to be a part of “We the People”? What rights do “We the People” have and where do those rights come from?​
Which of the following is associated with Qin San Shi? the construction of a major road system throughout ancient China the last emperor to rule before the o
Abuse of_______have been linked to the neurotransmitter dopamine.
If the ratio of bananas to apples is 2:1 and there are 24 apples, how many bananas are there?
If the height of a tower is three times that of a certain building. and the tower is 50 m taller than that building how tall is the tower
Why were the europeans able to embark on the voyages of exploration in the 15th century?
If two distinct coplanar lines are not parallel their intersection is a _____
Which group has elements with the most diverse set of properties