colettethompson402 colettethompson402
  • 13-04-2021
  • Mathematics
contestada

A mason gets $684 for 9 days
of work how many days
should he work to get $912​

Respuesta :

minhaoh
minhaoh minhaoh
  • 13-04-2021

Answer:

12days

Step-by-step explanation:

A mason gets 76 dollars per day. To get 912 dollars, divide 912 by 76. 12days.

Answer Link
Kellinly
Kellinly Kellinly
  • 13-04-2021

Answer:

12 days

Step-by-step explanation:

912/76 = 12

Answer Link

Otras preguntas

PLEASE HELP {It costs 5,700 every one sixth of an hour to build a hotel how many cents does building a hotel cost per second?}
A trapezoid has two right angles and bases that measure 16m and 8m. The right triangle formed by an altitude has a hypotenuse of 4 square root 5m. Sketch the tr
How do writers use direct characterization in a story?
How many electron transport chains are there in photosynthesis?
Read the sentence. Because he painted in a way that had never been seen before, the artist was known for his promethean style. What does promethean mean? d
The surgical repair of the roof of the mouth is:
Mike is considering investing $18,500 in an investment that will have a maturity value of $32,500 in 8 years. if the interest is compounded monthly, what is the
A mechanical wave generally does NOT A. move through a medium. B. move the medium from one place to another. C. move through solids. D. disturb the mediu
For thermometers to read temperatures correctly they must be
Select the correct inequality for the graph below: A solid line passing through points (1, 2) and (2, 5) has shading below. y < 3x − 1 y ≤ 3x − 1 y ≥ 3x