If you want to give a vendor an incentive to complete work early which type of contract would you use?

Respuesta :

kaisersriprad
kaisersriprad kaisersriprad
  • 14-03-2021

Answer:

Time and Materials Contract

Explanation:

A time-and-materials contract may be used only when it is not possible at the time of placing the contract to estimate accurately the extent or duration of the work or to anticipate costs with any reasonable degree of confidence.

Answer Link

Otras preguntas

english question down below
Why does the free enterprise economic system work well with a democratic political system?
why is the "tongue taste map" inaccurate?
The design on Santana’s wall includes 16 pink stripes and 20 green stripes. Find the ratio of pink stripes to green stripes.
Could somebody give me the answer
By the end of the nineteenth century, this country, which was unified in 1865, had become a leading world industrial nation.
Find the solution of the given initial value problem y'+2/ty=cost/t^2
the sum of the cube of a number and 12
What is The Temple of Isis also known as? A. Philae Temple B. Temple of the Gods C. Tut's Temple
Surface area of sphere 5cm