sumeirahaseen28 sumeirahaseen28
  • 14-02-2021
  • Chemistry
contestada

Calculate the amount of work done in lifting a heavy load of 50kg up to the height of 3m?

Respuesta :

laisianaturaga
laisianaturaga laisianaturaga
  • 14-02-2021

amount of work done is equal to l/h

so 50/3=16.66667

round your ans to 2 significant figure

so your ans will be 17m/kg

Answer Link
jess9442 jess9442
  • 14-02-2021
have to find the lift which would be 50kg times 9.8N/kg which would give you 490N. the formula for work is force times distance. so 490N times 3m= 1470J
Answer Link

Otras preguntas

How can you tell an equation is linear? Example: 22x-14y=65
How many smaller rectangles are there in an area model that represents 27 x 83? Why? What are their dimensions?
Translate the following Latin phrases to english;Sextus Davum saepe vexat; Sextum Davus non amat.Puellae Marcum et servum conspiciunt.Magna vox puellam terret.M
according to the author, what were condition like in europe during the 800's
From a pile of 100 pennies(P), 100 nickels(N), and 100 dimes(D), select 21 coins which have a total value of exactly $1.00. In your selection you must also use
how are photosynthesis and cellular respiration opposite in terms of carbon dioxide
Solve for x in terms of a and b:x^2 - 3ax - 4a^2 = 0x = 4a, x = -a. <<<this is the answer but what are the steps to get it?
describe the ancient interaction between north africa and southwest asia
Solve for s. (s + 15) ÷ 3 = 8 s = Submit
the temperature at which a given substance will change from a liquid into a gas ?