imimperious2117 imimperious2117
  • 11-02-2021
  • Mathematics
contestada

Iii. A contractor hired 14 unskilled labourers to complete a job. It took 5 days for 20 men to complete the same job. How long will it take the hired labourers?

Respuesta :

sophia8833
sophia8833 sophia8833
  • 11-02-2021
The clock will tell you the time of how long it will take
Answer Link

Otras preguntas

How long will it take your money to triple if you receive 10% return on your money, compounded annually?
5. A local flower shop sells a dozen roses for $12.85. Based on this information, which of the following could be true? 6. ban bor 2 ye to k A. $38.55 for four
Identify the graphed linear equation. A) y = 3.5x + 3.5 B) y = 3.5x - 3.5 C) y = -3.5x + 3.5 D) y = -3.5x - 3.5
Which of the following statements is true? a.Quats are halogen-based disinfectants, while hypochlorite-based disinfectants are cationic detergents. b.Quats are
How do I get x by itself when I have 2x=8
Estimate the value of
Suppose the supply of tomatoes in California significantly increased this year. As a result, would you expect the total revenue from the sale of tomatoes to ris
question 5 please answer
this is a one sentence summary of a paragraphs main point
Epidemiological studies: You Answered a/can establish that a risk factor causes a disorder. b.overcome almost all of the limitations of correlational studies. c