freddyayala1002 freddyayala1002
  • 15-10-2020
  • Computers and Technology
contestada

Linda is a core member of a project. She estimates the cost of the project, creates project requirements, and notes risks. What is Linda’s position in the project?

Linda is the project
.

Respuesta :

luisfuentes06elcuh luisfuentes06elcuh
  • 15-10-2020

Explanation:

no linda is the core member not rhe project

Answer Link
narstarolor
narstarolor narstarolor
  • 12-04-2021

Answer:

Project Manager

Explanation:

plato-edmentum

Answer Link

Otras preguntas

A student drops a ball from a height of 90.0m. If the ball remains in the air for 4.24s, determine all unknowns and answer the following question. Assume the ba
6.) The perimeter of a square is 12√5 cm. Find the length of each side and the area of the square.
Which sentence has all of the adjectives italicized? I like refried beans and cheese on my burritos. My mother’s hands were all dusty with white flour. Homemade
(a) Cite strong and thorough textual evidence to support analysis of what the text says explicitly. Review Screen 2 in “How to Tell You’re Reading a Gothic Nove
Which process would most likely result in the formation of a volcano? A central crack forms where a thin section of the earth’s crust breaks, and molten rock se
Question) A convex mirror has a radius of curvature of 28.4 cm. If you hold a 16-cm-long pencil 23.5 cm in front of the mirror, what will the image position and
ASAP PLEASE!!!!!!!!!!!!!
The formula C= 2nr is used to calculate the circumference of a circle. Solve this formula for r.​
I need this answered answered please
What is piles how to do treatment of it is ​