adrianty883 adrianty883
  • 14-11-2019
  • Mathematics
contestada

A 16 1/2 kilometer stretch of road needs repair. Workers can repair 2 1/4 kilometer of repair of road per week. How many weeks will it take to repair this road.

Respuesta :

jaxson0359 jaxson0359
  • 14-11-2019

Answer:

a

Step-by-step explanation:

Answer Link

Otras preguntas

What does Anne Frank do in response to loud war noises outside?
What two numbers multiply to 196 and add to -28?
Why did the hotel manager refuse to seeing Charley Thomas a hotel room?
Which events of 1943 helped make an Allied victory possible? Choose all answers that are correct. A. Japanese land and naval forces surrendered in the Pacific.
FDR's plan for ending the Great Depression was called the _____Deal.
~Integers and the Number Line~ 10 points! please help.
Which battle was the turning point of the war, after which the South’s fortunes declined? a)Appomattox b)Ft. Sumter c)Gettysburg d)Shiloh
which of the New Deal programs that passed. during the hundred days was effective, why?
Which of the following is one of the three main guidelines for writing? A. Offer description that's based on one of your senses. B. Minimize details. C
Primary and secondary waves are _____ waves, and Love waves are _____ waves. Help .. ..