Longjeremiahs8241 Longjeremiahs8241
  • 14-05-2024
  • Computers and Technology
contestada

How can Excel be used to calculate the critical path in a project network?
a. By using macros and VBA programming
b. By using the Data Analysis Toolpak functions
c. By manually analyzing the project network diagram
d. By using the Solver tool with appropriate constraints

Respuesta :

Otras preguntas

What the correct answer
Which verbal phrase represents " The difference between 8 and a number, r." A.)8 - r B.)r - 8 C.)8 + r D.)r / 8
Radioactivity is a random Process, Why?
I’ve been confused on this problem for awhile :(
-10=(3/2)-4+b solve for B
Marilyn collects old dolls. She purchases a doll for $450. Research shows this doll's value will increase by 2.5% each year. Write an equation that determines t
Can some one please help me?
help fast A geologist studies a layered rock to determine its age. Bacteria fossils from the Precambrian Age are found in the rock's upper layers, but no fossil
find the gradients of A and B
What is the equation of the line that passes through the point (-6,6) and has a slope of 1/3?