kwartakmanjan1563 kwartakmanjan1563
  • 12-01-2024
  • Business
contestada

The time an activity will take assuming very unfavorable conditions is referred to as:
A. Pessimistic time
B. Delay time
C. Total slack time
D. Optimistic time
E. Most likely time

Respuesta :

Otras preguntas

1. Lin’s family has completed 60% of a trip. They have traveled 30 miles. How long is the whole trip? A. 50 miles B. 48 miles C. 30 miles D. 18 miles
The Old Man of the Mountain was a rock formation on the side of Cannon Mountain in New Hampshire. Scientists believe it formed 200 million years ago when the mo
can someone answer this… im bad at math
In this polygon, all angles are right angles. What is the area of this polygon? Enter your answer in the box.
Solve the math problem
The function F(x) = 3 (x – 3)(x + 3) is never equal to zero. O A. True O B. False SUBM
Based on this excerpt from “The Passing,” it can be inferred that the boys _____.
Who ever answers first gets branliest :))
What type of phrase is underlined? Surprised by the comment, Ms. Drake giggled. a. Adverbial Phrase b. Participial Phrase c. Prepositional Phrase
Which number would make the statement true? (2 points) 0.243 > ________ 0.253 0.293 0.232 0.272