lead time for cakes is 2 days with daily demand of 4 cakes and a safety stock of 1/2 day. each container (kanban) holds 2 cakes. what is the correct number of kanbans?

Respuesta :

Otras preguntas

The Internet may best be compared to a/an
75% of 84 is what number
Toussaint L’Ouverture issued a constitution to ensure that
The various forms of a single gene that code for brown, blonde, or red hair are called a. alleles b. phenotypes c. locus d. genotypes
If f(x) = 2x2 + 3x and g(x) = x – 2, what is (f + g. (2)? a. 16 b. 14 c. 12 d. 10 e. 8
Which vitamin plays a primary role in vision and the development of body cells? a. vitamin A b. vitamin B6 c. vitamin C d. vitamin D
Which nationality did Alexander the Great claim to be? A.Greek B.Roman C.Persian D.Aryan
The leader of the Bolsheviks was _____. a. Tolstoy b. Alexander c. Lenin d. Nicholas
If the factors of a polynomial are x + 4 and x + 8, what values of x make that polynomial 0? a. 1 and 4 b. 4 and 8 c. -4 and -8 d. Cannot be determined
If we know the force, the distance, and the time we can calculate only power. work and power. only work. neither work or power.