Vadel2882 Vadel2882
  • 12-10-2022
  • Business
contestada

the top-down method for estimating project time and cost that uses weighted variables based on major parameters and is frequently used in the development of software is known as the method.

Respuesta :

Otras preguntas

What is the most studied transform fault in the world
Simplify this expression: 4p + 9 + (–7p) + 2 = ? A. 11p + 11 B. 3p + 7 C. –3p + 11 D. 3p + 11
On the basis of bonding which of the following compounds has the highest boiling point
what is 99/100 over 21 in simplest form
What is the stream of consciousness writing technique? A. The traditional plot and structure the author uses to keep the flow of ideas. B. A work of literature
what do you call the belief that the natural world is filled with spirits
which of the following is one reason why the demand for slaves increase in the southern colonies?
what are some characteristics of the amish people
Draw two different ways to show 43 using place value blocks
25- {2 x (18 divided by 6) + 1]